Skip to Content

Transforming Release Management for a Marketing Technology Organization

November 12, 2025 by
Transforming Release Management for a Marketing Technology Organization
Doyle Turner

Background

A mid-sized marketing technology company was at a pivotal point in its operational maturity. While the team was committed and capable, their release management process relied on fragmented workflows, manual deployments, and undocumented practices. These gaps introduced risk, reduced visibility, and constrained innovation—especially after the departure of a key engineer.

Challenges

The assessment revealed systemic issues across multiple dimensions:

Change & Release Management

  • No formal gating to control what enters a release, increasing risk of untested code in production.
  • Manual merges and inconsistent pipeline rules leading to unpredictable outcomes.
  • No rollback capability—failed deployments required manual fixes, increasing downtime.
  • Some releases bypassed staging entirely, undermining quality assurance.
  • No automated release notes or artifact reuse, creating variability between environments.

Testing & Validation

  • CI/CD pipelines lacked automated unit, integration, or regression testing.
  • Database changes were manually validated with no rollback strategy.
  • Pull request standards were inconsistent across teams.

Security

  • No secrets scanning, static/dynamic analysis, or vulnerability checks in pipelines.
  • No SBOM generation or dependency validation for third-party libraries.
  • No governance for open-source usage, introducing compliance and security risks.

Visibility & Traceability

  • No tagging or dashboards to track deployments across environments.
  • Release documentation was incomplete or missing.
  • Pipeline understanding was fragmented, creating knowledge silos.

Institutional Knowledge Loss

  • Departure of a long-tenured engineer left undocumented processes and tooling.
  • No standardized onboarding process for developers, increasing ramp-up time and risk.

These challenges collectively contributed to slower delivery cycles, higher operational risk, and reduced confidence in production releases.

Solution

Incremental Systems partnered with the organization to design and implement a phased modernization roadmap focused on governance, automation, security, and sustainability.

Phase 1: Foundation & Visibility

  • Standardized Git practices and semantic versioning.
  • Introduced dashboards for environment visibility.
  • Embedded documentation checkpoints into workflows.

Phase 2: Automation & Security

  • Integrated automated testing into CI/CD pipelines.
  • Enforced secrets scanning and dependency validation.
  • Generated SBOMs for compliance and security posture improvement.

Phase 3: Environment & Deployment Modernization

  • Containerized applications and introduced orchestration strategies.
  • Implemented blue/green and canary release strategies.
  • Defined and tested rollback mechanisms for safer deployments.

Phase 4: Governance & Continuous Improvement

  • Automated release notes and stakeholder sign-off workflows.
  • Established feedback loops and continuous improvement metrics.

Deep Training on Release Management

To ensure long-term success, Incremental Systems delivered comprehensive training sessions for engineering and release teams. Training covered:

  • Modern branching strategies and semantic versioning.
  • CI/CD pipeline design and modularization.
  • Automated testing and security enforcement.
  • Release governance and rollback strategies.
  • Documentation best practices for onboarding and continuity.

This training empowered internal teams to maintain and evolve the new processes independently, reducing reliance on external consultants and strengthening organizational resilience.

Impact

  • 50% Faster Release Cycles through automation and streamlined workflows.
  • 20–30% Reduction in Downtime with rollback strategies and artifact reuse.
  • Improved Security Posture via proactive controls and compliance tooling.
  • Enhanced Stakeholder Confidence with transparent dashboards and standardized documentation.
  • Sustainable Knowledge Transfer through deep training and embedded documentation practices.

ROI Timeline

  • 0–6 Months: Operational stability and early efficiency gains.
  • 6–12 Months: Accelerated delivery cycles and improved team productivity.
  • 12–18 Months: Full ROI realization through scalability and sustained maturity.
Share this post
Tags
Our blogs